
Proteus 2000 Operation Manual 13
Setup
This section thoroughly describes how to set up your new Proteus 2000 for
use. Setup includes unpacking instructions and how to connect the Proteus
2000 cables.
Unpacking Carefully remove Proteus 2000 from the packaging material. Take care to
save the packing materials in case you need to transport the unit. Check to
make sure all components are included and in good condition. If there are
missing or damaged components, contact E-MU Systems immediately for
replacement or repair.
The Proteus 2000 box should include the following components:
• Proteus 2000 unit
• Power cable
• Rack mounting ears
• This Operations Manual
Comentarios a estos manuales